Capacity and offtake
Source colocation capacity, or secure anchor tenants and customers.
Find capacity:
Sourcing contiguous racks, high-density AI and GPU pods, wholesale data halls or a powered shell? Share your target market, kW or MW of IT load, rack density, cooling requirements and go-live date. You get a shortlist of matching facilities with operator proposals compared side by side, plus direct introductions to the operators. Find a site or capacity · Wholesale colocation guide.Find tenants and offtakers:
Need an anchor tenant or pre-let to back a new build, or customers for live wholesale and colocation halls? Tell us your available MW, delivery schedule and cooling capability, and we introduce AI, cloud, neocloud and enterprise compute buyers whose requirements fit your hall. Anchor tenants and pre-lets · Offer capacity.
Technical evaluation and rack density
Digital Edge, quoting Uptime Institute’s 2025 Global Data Centre Survey, reports most deployments in the 10–30 kW per rack range, while a single modern GPU training rack can consume 40–130 kW. The European Data Centre Association reports AI-cluster rack densities in Europe frequently exceeding 30–80 kW per rack. Digital Edge, citing Uptime Institute guidance, notes that air cooling becomes insufficient above roughly 30–40 kW per rack. Technical teams evaluating dense deployments must therefore review heat rejection and power distribution limits.
Diligence questions for technical buyers include:
- Does the facility support direct-to-chip connections or facility-water loops, as examined in liquid cooling?
- What slab floor-loading limits apply for dense server enclosures and battery cabinets?
- How does the operator manage containment between enterprise rows and higher-density pods?
- Does the electrical topology provide dedicated uninterruptible power supply reserves for accelerated compute?
- What chilled-water supply temperatures, flow rates and heat exchanger redundancies exist at the row level?
- What physical security layers and access controls protect dedicated cabinet or cage space?
- What documented uptime commitments, power topologies and cooling redundancies does the colocation provider evidence?
- What network connectivity options, meet-me rooms and carrier routes serve the facility?
Procurement models and commercial terms
Australia, UK, US and Canada
Capacity screened on power, cooling, connectivity and delivery dates.
Enterprise cages and high-density GPU clusters demand different electrical redundancy and heat-rejection plant. We track 115 facility profiles and 44 regional operator profiles across Australia and the United Kingdom, alongside 2,004 project signals tracked across Australia (215) and the UK (1,789), including 1,340 planning records and 663 operator announcements, plus colocation and wholesale capacity coverage across the United States and Canada. We match buyer requirements and operator offerings discreetly across every deployment format:
- Commercial footprint: Retail colocation cages, contiguous wholesale data halls, turnkey build-to-suit facilities and powered shell leases.
- High-density and AI compute: Air-cooled enterprise rows through to high-density GPU racks requiring direct-to-chip liquid cooling, rear-door heat exchangers and reinforced slab loading.
- Power and connectivity: Committed IT load, N+1 or 2N electrical topologies, carrier-neutral meet-me rooms, dark fibre routes and cloud on-ramps.