CDC Data Centres
Our selected directory lists the CDC Eastern Creek Campus in Sydney, alongside the CDC Hume Campus and CDC Fyshwick Campus in Canberra, to assist buyers evaluating facility locations and technical procurement requirements.
At a glance
- HQ
- Canberra, AU
- Parent
- Infratil / CSC
- Ownership
- private
- Listing
- Private
- Founded
- 2007
Market presence
Capacity and site counts are only shown on public facility pages when the figure is directly operator-published. Full footprint and signal detail stay private.
Technical procurement checks
- Verify utility power reservations, dual high-voltage grid connections, and dedicated transformer redundancy rather than relying on headline campus power metrics.
- Review planning approvals, local zoning allowances, environmental development consents, and any municipal noise or emissions limits governing backup generator plant.
- Assess structural floor slab loading limits, clear ceiling heights, and thermal dissipation parameters for high-density rack configurations and liquid cooling integration.
- Inspect physical security boundaries, multi-factor access control regimes, and physical zoning separations required between shared halls and private data suites.
Commercial terms and future capacity
- Audit telecommunications pathways, dual lead-in points, carrier-neutral meet-me room access, and diverse dark fibre connectivity to metropolitan switching centres.
- Public disclosures on 6 May 2026 announced 555 MW of contracted future capacity across development campuses, scheduled to become operational across FY28 and FY29 rather than representing currently delivered or operational capacity.
- Infratil · 6 May 2026
Indicative · verify with operator
CDC Data Centres facilities
All data centresKnown existing facilities linked to CDC Data Centres in our directory, compiled from public records. Capacity is shown only where the operator has published it.
CDC Data Centres development pipeline
Planning, grid and tender activity linked to CDC Data Centres, by build stage, tracked from public records. Review detailed records and sources through private intelligence access.
3 public-record signals across CDC Data Centres's footprint sit in our funnel, classified by build stage.
CDC Data Centres, frequently asked
What commercial terms should buyers review when negotiating with CDC?
Examine commercial lease structures, power pass-through mechanisms, targeted power usage effectiveness benchmarks, and SLA remedy schedules during contract negotiation.
How should buyers plan for future capacity expansion with CDC?
Establish contractual options for contiguous white space and verify remaining medium-voltage substation capacity to accommodate future increments in IT load.
Enquire about CDC Data Centres.
Ask about a facility, submit a capacity requirement or send a sourced correction.